FDOT/BROWARD COUNTY Projects

FDOT BROWARD

Project 10: Pembroke Road Expansion from Douglas Road to University Drive

SCOPE: Roadway expansion from 4 to 6 lanes, including median, buffered bike lanes, sidewalks.  Also, buffer wall along residential properties if warranted by FDOT analysis/studies.

SCHEDULE: Design in 2021 and Construction in 2027.


Project 10 - Pic

Project 11: University Drive Mobility Project

SCOPE: Construct buffered bike lanes, sidewalks, lighting along University Drive between Riviera Boulevard and Pembroke Road.  In addition, a pedestrian bridge across the canal is proposed at Miramar Boulevard to connect University Drive to Utopia Drive.

SCHEDULE: Design in 2020 and Construction in 2022.

Project 11 - Pic

Project 12: Dykes Road Drive Mobility Project

SCOPE: Construct buffered bike lanes along Dykes Road between Bass Creek Road and Pembroke Road, including the extension of the eastbound right turn lane from Miramar Parkway onto I-75.

SCHEDULE: Design in 2020 and Construction in 2023.

Project 12 - Pic

Project 13: Roundabout at SW 148th Avenue and Basscreek road

SCOPE: Intersection safety improvements, including the construction of a roundabout at the intersection of SW 148th Avenue and Basscreek road, and a walking path from Coral Cover Elementary school.

SCHEDULE: Design in 2020 and Construction in 2023.

Project 13 - Pic

Project 14: Bike Lanes along Miramar Parkway and SW 184th Ave.

SCOPE: Construct 7’ buffered bike lanes along Miramar Parkway between SW 184th Avenue and SW 172nd Avenue.; and 10’ shared path along SW 184th Avenue between Basscreek road and Miramar Parkway.  Also, ADA improvements at the intersection of Miramar Parkway and SW 184th Avenue.

SCHEDULE: Design in 2020 and Construction in 2023.

Project 14 - Pic 1
Project 14 - Pic 2
Project 14 - Pic 3

Project 15: SW 64th Avenue Complete Street Improvements.


SCOPE: Construct 8’ shared path and sidewalks along SW 64th Avenue between SW 35th Street and Pembroke Road.

SCHEDULE: Design in 2020 and Construction in 2023.

Project 16: Homestead Extension FL Turnpike (HEFT) Widening


This is an FDOT project with approximate construction cost of $143 million. Work started in late 2018 and is anticipated to be completed in summer of 2022. The project scope includes:

  • Widening Turnpike from four to eight lanes
  • Constructing sound walls along qualifying communities, including Country Club Ranches
  • Improving signage, pavement markings and lighting
  • Intersection improvements at:
    • NW 57th Avenue/Red Road
    • NW 27th Avenue/University Drive
  • Widening the following bridges:
    • Flamingo Road
    • NW 47th Avenue/Palm Avenue
    • NW 37th Avenue
    • NW 27th Avenue/University Drive
    • Snake Creek Canal
Project 16 - Pic 1
Project 16 - Pic 2