ROADWAY PROJECTS UNDER DESIGN OR CONSTRUCTION

Roadway Projects Map - 8.22_Page_3

Project 4: Bass Creek Road connection west of SW 172nd Avenue

SCOPE: Construct new roadway connection of Bass Creek Road between SW 172nd Avenue and the north entrance to Sunset Falls development.

SCHEDULE: Design in 2020 and Construction in 2022

Project 4

Project 5: Miramar Boulevard at Buttonwood Avenue

SCOPE: Construction of a westbound left turn lane along Miramar Boulevard onto Buttonwood Avenue. Work is inclusive of tree removals and the relocation of the existing irrigation pump to a new well in order to accommodate the new turn lane. 

SCHEDULE: Design in 2022 and Construction in 2022
Project 5 - Buttonwood Aerial

Project 6: Historic Miramar Technology Village


SCOPE: 

•    Extension of SW 33rd Street between SW 68th Avenue and SW 69th Ave.

•    Modification of Intersection at SW 69th Ave. and Entrance to MYEC and                  HD Perry School       

•    Roundabout at SW 69th Ave and SW 34th Street

•    Paved parking areas adjacent to A.C. Perry School

SCHEDULE: Design in 2022 and Construction in 2023

Project 6 - HM Tech Village Roadway Improvements

Project 7: Eastbound right turn lane along Pembroke Road onto Flamingo Road

 

SCOPE: Construct a dedicated right turn lane for eastbound traffic on Pembroke Road turning south on Flamingo Road

SCHEDULE: Design in 2022 and Construction in 2023

Project 7 - EB RT Lane Pemb Rd onto Flamingo

Project 8: SW 148th Avenue Improvements for Fire Station 19

 

SCOPE: Expand general southbound thru lane staring at SW 29th Street and add an additional southbound right turn lane at the intersection of Miramar Parkway, to provide accessible path to emergency vehicles coming out of Fire Station 19 

SCHEDULE: Design in 2022 and Construction in 2023

Project 8 - 148 Ave Improvements